- the cavity is soley a secound line of defence should a failure of the weatherskin occur.
- minimum cavity depth of 20mm.
- specifying continuous vertical battens.
- ensure the cavity always drains outside the building.
- ensure the cavity is vermin-proofed.
- closinf off the top of the cavity from all roof and eaves spaces
No comments:
Post a Comment