April 11th

measured out position of rafters. . . .cut and hammered in . . . .chizeled and got steel straps really for tuesday

April 6th

cut and measured floor bracing. . . . .hammered in and plained off un-flushed surfaces. . . .once that was finished we brought each wall framing over. . . .braced to the floor, while we square up the walls. . . .as soon as we squared up the walls we fixed them together and to the floor. . . .we braced it off so it doesnt fall over

April 5th

started in the computer room and started up our smart sheet. . .  .the smart sheet is designed to organise your time and what you have spent on materials. . . . .shows on a chart how much you have progressed

Monday, 4 April 2011

April 4th

today Kerry split up our team and we worked in two teams of three. . . . . one team bulit one wall and the other built the other small wall. . . . . .measured out top and bottom plate. . . .found the high point and short point from our other frames. . . . .nailled the short point and high point to bottom and top plates. . . . .used that to find the measurements of of our studs . . . . .cut and placed studs in. . . .  .measured out postion for lintel and nogs. . . .  . and wall was finished

30th March

today we built the front frame of the sleepout. . . . .measured top plate and bottom plate and placed all the measurements for the studs, understuds and the packers. . . . .cutt all timber and hammered framing together. . . . .measured up nogs and lintel. . . . . measured out postion for lintel where the sliding door is sitting. . . .