Monday, 4 April 2011

April 4th

today Kerry split up our team and we worked in two teams of three. . . . . one team bulit one wall and the other built the other small wall. . . . . .measured out top and bottom plate. . . .found the high point and short point from our other frames. . . . .nailled the short point and high point to bottom and top plates. . . . .used that to find the measurements of of our studs . . . . .cut and placed studs in. . . .  .measured out postion for lintel and nogs. . . .  . and wall was finished

No comments:

Post a Comment