Monday, 4 April 2011

30th March

today we built the front frame of the sleepout. . . . .measured top plate and bottom plate and placed all the measurements for the studs, understuds and the packers. . . . .cutt all timber and hammered framing together. . . . .measured up nogs and lintel. . . . . measured out postion for lintel where the sliding door is sitting. . . .

No comments:

Post a Comment