Monday, 11 April 2011

April 6th

cut and measured floor bracing. . . . .hammered in and plained off un-flushed surfaces. . . .once that was finished we brought each wall framing over. . . .braced to the floor, while we square up the walls. . . .as soon as we squared up the walls we fixed them together and to the floor. . . .we braced it off so it doesnt fall over

No comments:

Post a Comment